Haile gold mine project, US
Name and Location
Haile gold mine project, South Carolina, US.
Client
Romarco Minerals.
Project Description
The Haile gold mine has measured and indicated gold resources of 71.2-million tonnes at 1.77 g/t of gold, as well as an inferred gold resource of 20.1-million tonnes at 1.24 g/t of gold.
Proven and probable gold reserves are estimated at 30.5-million tonnes at 2.06 g/t.
The feasibility study envisages a conventional openpit mine, based on variable pit-slope angles.
The bulk of material from the mine will be hard rock, which will be drilled and blasted prior to loading. The mine is expected to produce 2.55-million tonnes of ore a year for delivery to the process plant.
The processing plant design incorporates conventional precious metals recovery processes, including jaw crushing, semiautogenous and ball milling, flotation, fine grinding of the flotation concentrate and carbon-in-leach cyanidation.
Final plant tailings will be stored in a conventional tailings facility.
Value
$275-million.
Duration
A timeframe has not been confirmed.
Latest Developments
Romarco Minerals has reported that the US Army Corps of Engineers has issued its record of decision (RoD) and granted a permit under Section 404 of the Clean Water Act for the company's Haile gold mine project, marking the end of the environmental impact statement (EIS) process.
As the corps does not have an administrative appeal process available for permit opponents after issuing the RoD, the permit is complete, final and immediately effective.
The 404 permit was the only federal environmental permit required for the Haile project.
Last year, Romarco received four state permits – a national pollutant discharge elimination system permit, an air-quality permit, a dam safety permit and a stormwater construction permit. The state approved its water quality certification earlier this month, recommending that the Corps grant Romarco the same certification at federal level.
The company is awaiting the state mine operating permit.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Romarco had hoped to break ground on the $385-million Haile project at the end of 2011, but work was delayed after the corps decided to request an EIS process, rather than the simpler environmental assessment, for which the company had hoped. Over the past four years, the company had spent more than $4.5-million on environmental studies.
Contact Details for Project Information
Romarco Minerals, Dan Symons, tel +1 416 367 5500, fax +1 416 367 5505 or email info@romarco.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















