https://www.miningweekly.com

Gum Creek gold project, Australia

29th July 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Gum Creek gold project, Australia.

Client
Panoramic Resources.

Project Description
The project is based on openpit mining from the Swan, Swift and Howards resources and includes processing product through a new 800 000 t/y carbon-in-leach processing plant to produce an estimated 290 000 oz of gold over an initial six-year mine life at an all-in sustaining cost of A$1 209/oz gold.
Yearly production for the first four years is estimated at 60 000 oz of gold.
The project includes the construction of a new processing facility, associated infrastructure and openpit predevelopment.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 11% discount rate, of A$62-million.

Value
Preproduction capital is estimated at A$62-million, including construction of a new processing facility; an internal rate of return of 30% is envisaged.

Duration
The project will take an estimated 12 months to complete.

Latest Developments
Panoramic has started a detailed design and optimisation study, and is seeking indicative funding terms for the project.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Panoramic Resources, tel +61 86266 8600, fax +61 8 9421 1008 or email info@panres.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.778s - 111pq - 2rq
Subscribe Now