Grota do Cirilo project dense-media separation production plant, Brazil – update

Name of the Project
Grota do Cirilo project dense-media separation (DMS) production plant.
Location
Minas Gerais, Brazil.
Project Owner/s
Sigma Lithium Resources.
Project Description
An updated feasibility study has demonstrated that Phase 1 of the project is financially robust, even as a standalone project.
The project has proven and probable reserves of 11.8-million tonnes grading 1.55% lithium oxide for 452 000 t of lithium carbonate equivalent.
Phase 1 will involve material from the Xuxa deposit (the Phase 1 mine) to be processed by Sigma Lithium’s green tech production plant (the Phase 1 plant), which, in turn, will produce battery-grade sustainable lithium, creating a fully integrated lithium operation.
The economic model proposes an average production plant feed of 1.5-million tonnes a year, resulting in production of about 230 000 t/y of 6% lithium concentrate over an eight-year life-of-mine.
While the base case is based on production of 6% lithium concentrate, Sigma has the option to deliver additional production of battery-grade sustainable lithium, maintaining specifications in line with current lithium markets of 242 000 t/y at 5.7% lithium oxide, 251 000 t/y at 5.5% lithium oxide and 265 000 t/y at 5.2% lithium oxide.
Sigma has also reported maiden mineral reserve estimates of 21.8-million tonnes grading 1.37% lithium oxide for 730 000 t lithium carbonate equivalent.
Metallurgical tests on Phase 2 have reinforced the confidence that a 6% lithium oxide concentrate can be produced at an overall lithium stage recovery of 60% while maintaining the coarseness of the lithium concentrate (crush size of -9.5 mm).
These results validate that the spodumene mineralisation from the Phase 2 deposit can be processed into battery-grade sustainable lithium in a similar manner to spodumene ore from the Phase 1 mine, without requiring major flowsheet modifications.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $1.6-billion and an internal rate of return of 424%, with a payback of four months.
Capital Expenditure
Phase 1 will cost an estimated $123.1-million to implement.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Sigma Lithium Resources, tel +55 11 2985 0089 or email contact@sigmaca.com/Investors: ir@sigmaca.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation