Grota do Cirilo project dense-media separation production plant, Brazil

Name of the Project
Grota do Cirilo project dense-media separation (DMS) production plant.
Location
Minas Gerais, in Brazil.
Project Owner/s
Sigma Lithium Resources.
Project Description
The Grota do Cirilo project is considered to be the biggest hard-rock lithium spodumene deposit in the Americas.
Phase 1 of the DMS production plant has been designed to produce up to 220 000 t/y of high-purity 6% battery-grade lithium concentrate, equivalent to about 33 000 t/y of lithium carbonate equivalent.
Sigma has said that it could potentially double the project’s capacity to 440 000 t/y, equivalent to about 66 000 t/y of lithium carbonate equivalent, through the addition of a processing line with a similar capacity to Phase 1. The preliminary feasibility study is expected to be completed in the first quarter of 2022.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Not stated.
Planned Start/End Date
Not stated.
Latest Developments
Sigma is negotiating an agreement for the engineering, procurement and construction management of the production plant and associated infrastructure with Promon and Primero group.
The company is also in negotiations with two mining contractors to build and operate the company’s first mine at the project.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Sigma Lithium Resources, tel +55 11 2985 0089 or email contact@sigmaca.com/Investors ir@sigmaca.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















