https://www.miningweekly.com

Green Giant Molo graphite project, Madagascar

9th January 2015

  

Font size: - +

Name and Location
Green Giant Molo graphite project, Madagascar.

Client
Energizer Resources.

Project Description
Energizer reported a new mineral resource for the Molo deposit in August 2014, consisting of a measured resource of 23.62-million tonnes grading 6.32% carbon, an indicated resource of 76.75-million tonnes grading 6.25% carbon and an inferred resource of 40.91-million tonnes at 5.78% carbon, for a combined total of 141.28-million at 6.13% carbon.

A preliminary economic assessment (PEA) on the project envisages a conventional openpit mining method using trucks and loaders, with a capacity of 1.17-million tonnes a year of ore at 92% availability, with an average head grade of 8.5%.

The processing will entail three-stage crushing, followed by a primary milling and flotation separation circuit. The resultant flake graphite concentrate will be thickened, dried, separated into various flake sizes, packaged and stored before shipment. The final residue generated by the flotation process will generate a clean, nonacidic tailing. The concentrate production is estimated at an average of 84 000 t/y of graphite concentrate, with an average specification of 92%.

Net Present Value/Internal Rate of Return
The PEA estimates a pretax net present value, at a discounted rate of 10%, of $421.46-million and a pretax internal rate of return of 48%, with a payback of three years.

Value
The estimated capital cost for the project is $162.04-million.

Duration
Production is slated for 2015.

Latest Developments
Energizer brokered a private placement in September 2014 to raise $4.8-million to fund the production of additional graphite concentrate samples at its Molo project.

The additional graphite concentrate samples will be required for potential offtake groups and end-users of graphite with which the company is in advanced discussions.

While a pilot-scale plant is already in operation at Molo, Energizer is targeting the start of commercial production of between 50 000 t/y and 150 000 t/y of graphite in 2015.

Key Contracts and Suppliers
Not stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Energizer Resources senior VP of corporate development Brent Nykoliation, tel +1 416 364 4911, fax +1 416 364 2753 or email info@energizerresources.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.835s - 111pq - 2rq
Subscribe Now