https://www.miningweekly.com

Galalar silica project, Australia – update

Image of Australia map/flag

24th September 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Galalar silica project.

Location
North Queensland, Australia.

Project Owner/s
The project is a partnership with Diatreme Resources and the traditional owners, Hopevale Congress (12.5%).

Project Description
Galalar is one of the largest high-purity silica exploration land packages in Australia.

A scoping study has confirmed that the project can become a significant near-term, low-cost and premium-quality silica producer.

The project has a total mineral resource of 47.5-million tonnes, with potential for further expansion. This includes maiden measured mineral resources comprising 30.9-million tonnes at 99.28% silica oxide.

The project has 15-year mine life producing 750 000 t/y, based on a 79% recovery rate.

Potential Job Creation
The project has the potential to generate more than 110 full‐time jobs.

Net Present Value/Internal Rate of Return
The project has a pretax nominal net present value, at a 10% discount rate, of A$231-million and an internal rate of return of 150%, with a payback of eight months.

Capital Expenditure
An independent economic study has shown that the project could deliver a sizeable economic injection into Hope Vale, Cooktown and the surrounding region, including about $23‐million to $24-million in the construction phase and up to $42-million in operation.

Planned Start/End Date
Not stated.

Latest Developments
Diatreme Resources has reported a 22% increase in the resource estimate for its Galalar project.

The company has reported that the Joint Ore Reserves Committee-compliant resource is at 75.5-million tonnes, up from the previous estimate of 61.9-million tonnes, following exploration and drilling campaigns.

Diatreme recently announced plans to raise A$10-million through a share placement to fund work at the Galalar project, including the delivery of a feasibility study and definitive feasibility study, early site works and exploration, as well as for general working capital.

Key Contracts, Suppliers and Consultants
Ausrocks (mineral resources).

Contact Details for Project Information
Diatreme Resources, tel +61 7 3397 2222 or email manager@diatreme.com.au.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rio-Carb
Rio-Carb

Rio Carb is an OEM (Original Equipment Manufacturer) of R-C700 Chromium Carbide (CrC) alloy clad wear plates and pipes used for heavy materials...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.876s - 111pq - 2rq
Subscribe Now