Galalar silica project, Australia
Name of the Project
Galalar silica project.
Location
The project is located in far north Queensland, Australia.
Project Owner/s
The project is a partnership with Diatreme Resources and the traditional owners Hopevale Congress (12.5%).
Project Description
A scoping study has confirmed that the project is capable of becoming a significant near-term, low-cost and premium-quality silica producer.
Galalar has a current indicated mineral resource estimated at 21.5-million tonnes grading 99.2% silicon oxide, including an inferred resource of 8.7-million tonnes.
The project has a 15-year mine life at a rate of 950 000 t/y for a total 14.25-million tonnes of sand mined.
Potential Job Creation
The project could generate 30 to 40 jobs in the construction phase and 60 in production, with a focus on local employment, including for the traditional owners.
Net Present Value/Internal Rate of Return
The project has a pretax nominal net present value, at a 10% discount rate, of A$231-million and an internal rate of return of 150%, with a payback of eight months.
Capital Expenditure
The project has an estimated price tag of A$24.4-million.
Planned Start/End Date
Not stated.
Latest Developments
A mining lease application for the project is currently in a prelodgement process, with Queensland regulatory agencies expecting a formal submission. Preparation of external environmental surveys to be used for that submission is under way, with the dry-season studies and submissions expected to be completed over the coming weeks.
As a result of the highly positive results from the scoping study, Diatreme is actively progressing with next-step environmental studies and submissions, and advancing the permitting and approvals processes.
Diatreme has also identified potentially significant project enhancement options to the existing study, including the possibility of building a purpose-built barge ramp facility closer to the mine site.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Diatreme Resources, tel +61 7 3397 2222 or email manager@diatreme.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation