https://www.miningweekly.com

Gahcho Kué diamond project, Canada

30th September 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name of the Project
Gahcho Kué diamond project.

Location
Northwest Territories, Canada.

Client
Gahcho Kué Joint Venture (JV) – a collaboration between De Beers Canada (51%) and Mountain Province Diamonds (49%).

Project Description
Gahcho Kué, which is Chipewyan for ‘a place where big rabbits are found’, is located at Kennady Lake, 280 km north-east of Yellowknife and 80 km east of De Beers’ existing Snap Lake mine, in NWT. The diamond prospect is one of the largest new diamond projects under development globally.

The project consists of the Hearne North and South pipes; the 5034 West pipe, the Central and North-East pipes; the 5034 South pipe; the 5034 North pipe; Wallace; and the Dunn Sheet, Tuzo and Tesla diamondiferous kimberlite pipes, sheets and dykes.

A revised and updated feasibility study on the remote Gahcho Kué has confirmed its robust metrics.

The deposit has current National Instrument 43-101-compliant total probable reserves of 55.5-million carats, contained in 35.4-million tonnes grading 1.57 ct/t.

The mine life has been estimated at 12 years, during which the operation will produce about 53.4-million carats at an average yearly rate of 4.45-million carats. Standard drill-and-blast, and truck-and-shovel equipment and pit designs, will be used.

The average yearly output for the first three years of full production from 2017 to 2019 will be about 5.6-million carats.

Ore will be fed to a three-million-tonne-a-year processing plant, with three stages of crushing, dense-media separation and X-ray/grease diamond-recovery circuits.

Supporting infrastructure includes a 14.1 MW packaged diesel power plant, a 1 350 m gravel airstrip, a five-bay truck shop, an emulsion plant, a 40-million-litre fuel storage facility and a 432-bed accommodation/office complex.

Jobs to be Created
The mine, which comprises three openpits, will employ about 530 full-time employees.

Net Present Value/Internal Rate of Return
None stated.

Value
According to the revised and updated feasibility study, the project will cost C$859-million to construct and the operation will require working capital of C$80-million.

Costs to ramp up the operation to January 2017 have been estimated at C$82-million.

Duration
Production started in 2016.

Latest Developments
De Beers and its joint venture partner Mountain Province Diamonds have officially opened the Gahcho Kué diamond mine, in Canada, which will produce about 54-million carats of rough diamonds over its 12-year mine life.

The mine was opened officially by De Beers Group chairperson and Anglo American CE Mark Cutifani, De Beers Group CEO Bruce Cleaver, De Beers Canada CEO Kim Truter, Mountain Province Diamonds CEO Patrick Evans and representatives of the First Nations and Metis communities in the Northwest Territories on September 21.

Key Contracts and Suppliers
JDS Energy & Mining (feasibility study).

On Budget and on Time?
First production was started on time.

Contact Details for Project Information
De Beers Canada external and corporate affairs tel + 1 416 645 1710.
Mountain Province Diamonds, tel +1 416 361 3562, fax +1 416 603 8565 or email info@mountainprovince.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Advanced Fire Suppression Technologies
Advanced Fire Suppression Technologies

Established on 1 March, 2000, by Barries Barnard, Advanced Fire Suppression Technologies (AFST) and the Advanced Group stands as Sub-Saharan...

VISIT SHOWROOM 
Bell Equipment
Bell Equipment

As one of South Africa's leading manufacturers, Bell Equipment distributes and exports its wide range of heavy equipment globally to mining,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.041 0.821s - 111pq - 2rq
Subscribe Now