Name and Location
Gahcho Kué diamond project, Northwest Territories (NWT), Canada.
Client
Gahcho Kué Joint Venture (JV) – a collaboration between De Beers Canada (51%) and Mountain Province Diamonds (49%).
Project Description
Gahcho Kué, which is Chipewyan for ‘a place where big rabbits are found’, is located at Kennady Lake, 280 km north-east of Yellowknife and 80 km east of De Beers’ existing Snap Lake mine, in NWT. The diamond prospect is one of the largest new diamond projects under development globally.
The project consists of the Hearne North and South; the 5034 West pipe, the Central and North-East pipes; the 5034 South pipe; the 5034 North pipe; Wallace; and the Dunn Sheet, Tuzo and Tesla diamondiferous kimberlite pipes, sheets and dykes.
Gahcho Kué consists of a cluster of kimberlites, three of which have a probable mineral reserve of about 31.3-million tonnes, grading at 1.57 ct/t (about 49-million carats).
The project will have an estimated production rate of three-million tonnes of ore a year and 4.5-million carats a year.
The project design is based on the openpit mining of the 5034, Hearne and Tuzo deposits in a sequential fashion.
Mine plans call for the extraction of 233.7-million tonnes of waste and 31.3-million tonnes of ore over 11 years, using standard drill/blast and truck/shovel equipment and pit designs, which are similar to those of other openpit diamond mines operating in the area.
Ore will be fed to a three-million-tonne-a-year processing plant, with three stages of crushing, dense-medium separation and X-ray/grease diamond recovery circuits.
Supporting infrastructure includes a 14.1 MW packaged diesel power plant, a 1 350 m gravel airstrip, a five-bay truck shop, an emulsion plant, a 40-million-litre fuel storage facility and a 432-bed accommodation/office complex.
Value
An estimated capital cost of C$650-million to C$750-million.
Duration
The start of production is targeted for 2014.
Latest Developments
The Mackenzie Valley Land and Water Board has approved a pioneer land-use permit for the Gahchó Kue project. The permit allows land-based site works to begin in preparation for deliveries planned for the 2014 winter road season and for Gahchó Kue to prepare itself for the start of full construction, pending the receipt of the full land-use permit and water licence expected in 2014.
Meanwhile, the Gahchó Kue joint venture is updating the 2010 feasibility study and is expected to announce the results of the optimisation study early in the New Year.
Key Contracts and Suppliers
JDS Energy & Mining (feasibility study).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
De Beers Canada Northern Territories director of external and corporate affairs Cathie Bolstad, tel +1 867 766 7325, fax +1 867 766 7347 or email Cathie.Bolstad@debeerscanada.com.
Mountain Province Diamonds, tel +1 416 361 3562, fax +1 416 603 8565 or email info@mountainprovince.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation