Four Mile uranium project, Australia
Name and Location
Four Mile uranium project, Australia.
Client
The project is a joint venture between Quasar Resources (75%), an affiliate of Heathgate Resources, and Alliance Resources (25%).
Project Description
The Four Mile project can potentially become the highest-grade and largest operating in situ recovery (ISR) mine in the world. The project is located 550 km north of Adelaide, in South Australia. The sandstone-hosted deposit is defined by two mineralised zones within tertiary sediments – Four Mile East and Four Mile West – which occur within laterally extensive sands 140 m to 210 m deep.
Envisaged as an on-site recovery-style mining operation, with uranium to be captured at Heathgate Resources’ Pannikan satellite plant and elution, precipitation, drying and packing to take place at Heathgate’s Beverley processing plant.
The project is estimated to host a total mineral resource of 9.8-million tonnes, grading 0.44% uranium oxide (U3O8) for 71-million pounds of U3O8.
Value
A$97.8-million.
Duration
Not stated.
Latest Developments
Commissioning has started at Four Mile.
Engineering and construction at the uranium project is nearly complete, with the project remaining on schedule to start full production this month, subject to final regulatory approval of the monitoring strategy.
Key Contracts and Suppliers
Heathgate Resources (feasibility study); and Adelaide Control Engineering (final optimisation study).
On Budget and on Time?
The project has been delayed, owing to legal disputes between Alliance, Quasar and Heathgate.
Contact Details for Project Information
Alliance Resources, tel +61 3 9697 9090, fax +61 3 9697 9091 or email info@allianceresources.com.au.
Quasar Resources, tel +61 8 8110 0500, fax +61 8 8212 5559 or email info@quasarresources.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















