Florence copper project, US
Name and Location
Florence copper project, Arizona, US.
Client
Curis Resources.
Project Description
A prefeasibility study (PFS) completed on the Florence copper project envisages a revised extraction plan, compared to the development plan included in the 2010 preliminary economic assessment (PEA).
The study was based on an estimated 340-million tons of probable mineral reserves, grading 0.358% total copper at a cutoff grade of 0.05% total copper.
The revised plan uses existing facilities and locates the well field, the copper processing plant, water-management facilities and related infrastructure on the 65 ha Arizona State Land Department lease area, which will be controlled by Curis for the first nine years of operations. In the tenth year, production will expand to private land owned by Curis.
Yearly production has been revised to 55-million pounds of copper cathode for years 1 to 6, rising to 85-million pounds of copper cathode in years 7 to 21, and a decline thereafter. The PFS has also extended the commercial operating life of the project from 19 to 25 years.
Value
Initial capital costs are estimated at $196-million, an 18% decrease from the initial capital cost estimate presented in the 2010 PEA.
Duration
Copper production is scheduled to begin in 2016.
Latest Developments
Curis is awaiting approval from the Environmental Protection Agency for an underground injection control permit for a Phase 1 production test facility at the Florence project. The company will initiate formal construction and operations of the test facility once the permit is received.
Key Contracts and Suppliers
M3 Engineering & Technology Corp (PFS).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Curis Resources, tel +1 604 684 6365, fax +1 604 684 8092 or email info@curisresources.com.
M3 Engineering & Technology Corp, tel +1 520 293 1488, fax +1 520 293 8349 or email m3@m3eng.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















