First Cobalt refinery recommissioning project, Canada

11th October 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
First Cobalt refinery recommissioning project.

Location
Ontario, Canada.

Project Owner/s
First Cobalt.

First Cobalt and Glencore signed a memorandum of understanding on May 21, 2019, outlining the terms of a potential partnership to produce refined cobalt for
the North American market.

Project Description
The First Cobalt refinery is the only permitted primary cobalt refinery in North America.

The project entails the recommissioning of the First Cobalt refinery in a phased approach.

Phase1 includes a definitive feasibility study (DFS) to assess the suitability of the First Cobalt refinery to treat Glencore material under a long-term supply agreement to produce cobalt sulphate for the North American electric vehicle (EV) market.

Phase 2 envisages the commissioning of the refinery at a feed rate of 12 t/d in 2020 to produce a battery-grade cobalt sulphate for prequalification for the EV supply chain. This will be subject to the results of additional studies and an economic analysis to be completed during Phase 1.

Phase 3 involves an expansion of the refinery to a 55 t/d feed rate by 2021 using the current site infrastructure and buildings. An Ausenco scoping study previously estimated that, if the First Cobalt refinery operated at 55 t/d, it could produce 5 000 t/y of contained cobalt in sulphate assuming cobalt hydroxide feed grading 30% cobalt.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Total capital investment under the three phases is estimated at $45-million.

Planned Start/End Date
The refinery is expected to be recommissioned in late 2020.

Latest Developments
First Cobalt entered into a $5-million loan facility with Glencore in August 2019 to complete advanced engineering, metallurgical testing, fieldwork and permitting associated with a recommissioning and expansion of the First Cobalt refinery. Upon completion of a positive DFS for a 55 t/d refinery expansion in and subject to certain other terms and conditions, and satisfaction of conditions precedent, Glencore is prepared to advance an additional S$40-million to recommission and expand the refinery.

First Cobalt intends to start fieldwork in September.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Too early to state.

Contact Details for Project Information
First Cobalt, tel +1416900 3891 or email info@firstcobalt.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.82s - 111pq - 2rq
Subscribe Now