https://www.miningweekly.com
Coal|Construction|Exploration|Infrastructure|Mining|Power|PROJECT|rail|Road|Roads|Slurry|Water|Equipment|Environmental|Infrastructure|Operations
Coal|Construction|Exploration|Infrastructure|Mining|Power|PROJECT|rail|Road|Roads|Slurry|Water|Equipment|Environmental|Infrastructure|Operations
coal|construction|exploration|infrastructure|mining|power|project|rail|road|roads|slurry|water|equipment|environmental|infrastructure|operations

First coal production due in 2020

BULKY An estimated 600 000 t of coal production a month is expected

BULKY An estimated 600 000 t of coal production a month is expected

Photo by Creamer Media

14th December 2018

By: Thabi Shomolekae

Creamer Media Senior Writer

     

Font size: - +

Coal mining and exploration group of companies Canyon Coal is expecting first coal production at its Springfield coal project in the second quarter of 2020, with a targeted production rate of 600 000 t of run-of-mine coal a month.

The project, comprising a coal deposit of 307.86-million tons, is located between Vereeniging and Meyerton in Gauteng, within the Vereeniging-Sasolburg coalfield.

Canyon Coal exploration and mine development manager Clifford Hallatt says the project has an excellent strip ratio, with an average of 1:1.6 bank cubic metres a ton and an estimated life-of-mine of 40 years. “The sheer volume of extractable coal, together with direct access to existing infrastructure – operational road and rail networks – and an immediate workforce, automatically makes this project attractive to any investor.”

Hallatt says the Springfield area contains top seam, as well as nonselect and select bottom seam.

The top seam varies between 0 m and 5.71 m in thickness and is on average modelled to be 1.99 m thick. Based on historical data, this seam thickens and becomes more consistent in distribution towards the western boundary of the property. The nonselect bottom seam varies between 0 m and 7.94 m in thickness and is modelled on average to be 2.71 m in thickness. Also, the select bottom seam varies between 0 m and 17.96 m in thickness and is on average 8.35 m thick.

However, the parting between the nonselect and select bottom seams is very thin, with an average thickness of 0.2 m.

The project will comprise the construction of a 1 000 t/h processing plant to beneficiate the coal volumes being produced, with current planning allowing for the conventional truck-and-shovel, roll-over mining method.

“Owing to the high target production rate, our mining teams will consist of larger-capacity machines to limit the number of machines in the pit and still maintain the required output,” Hallatt points out.

The project infrastructure and equipment will also include a railway siding; weighbridges; a substation for power supply; stormwater infrastructure, such as pollution control dams, slurry facilities and sewage treatment facilities; and civil infrastructure such as roads and culverts.

Meanwhile, Hallatt mentions that Springfield has been extensively drilled since the 1930s. The historical drillhole database consists of 1 163 boreholes, drilled between the 1930s and the early 1950s. However, in November last year, an additional 30 boreholes were drilled to verify the historical information.

Three granted prospecting rights are being converted, covering the full extent of the project area into one consolidated mining right. This process includes submitting a water-use licence application and environmental authorisation application.

“As with our other operations within the group, we intend to develop Springfield in a cost-effective manner to minimise capital expenditure. “During operations, efficiencies will be managed and monitored closely to maximise profits.”

Hallatt concludes that Canyon Coal’s access to a variety of markets gives it the edge in developing and successfully operating this project.

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

Latest News

Marula CEO Jason Brewer
UK-based Marula Mining lists on A2X in South Africa
Updated 6 hours ago By: Marleny Arnoldi

Showroom

Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.164 0.206s - 97pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: