Fenix gold project, Chile
Name of the Project
Fenix gold project.
Location
The project is located in the Maricunga mineral belt of the Atacama region, in Chile.
Project Owner/s
Rio2.
Project Description
Rio2 has completed an updated prefeasibility study (PFS) on the Fenix project. This PFS is strategically focused on an optimally configured mine plan, which will facilitate the shortest possible timeline to construction and production, a lower initial capital expenditure, higher grades initially being mined and a lower initial strip ratio, compared with the 2014 PFS.
The PFS focuses on a low-cost heap-leach gold mine with 1.83-million ounces of gold reserves grading 0.49 g/t, which will produce 1.37-million ounces of gold.
The PFS contemplates mining ore at 20 000 t/d, with water for the project being trucked from Copiapo. This compares with the ore mining rate of the 2014 PFS, which was a constant 80 000 t/d with water for the project being piped from Copiapo. To maximise cash flow, high-grade ore will be placed on the leach pad during the initial 13 years of production. Low-grade ore will be stockpiled for leaching in the subsequent three years of pro-duction, providing a total mine life of 16 years.
Average gold production during the first 13 years will be 93 000 oz/y and 50 000 oz/y during the final three years of production as stockpiled ore is being crushed and leached.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $168-million and an internal rate of return of 27.4%
Capital Expenditure
Initial capital expenditure is estimated at $111-million.
Planned Start/End Date
Construction is currently targeted for the fourth quarter of 2021 and first gold production for the fourth quarter of 2022.
Latest Developments
The principal focus for management during the two-year lead up to construction will be to optimise the estimated capital expenditure for the construction of the project and refine and reduce the current operating cost estimate where practicable.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Rio2, tel +1604260 2696 or email info@rio2.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















