Farim phosphate project, Guinea-Bissau

5th August 2011

By: Lindiwe Molekoa

  

Font size: - +

Name and Location
Farim phosphate project, Guinea-Bissau.

Project Description
The project is located about 5 km west of the town of Farim and some 120 km north of Bissau.

It consists of a high-grade sedimentary phosphate deposit of one continuous phosphate bed, which extends over a known surface area of about 40 km2. The Farim phosphate deposit is a world-class, high-quality development containing a total resource of 128-million tons, at 29.8% phosphorus pentoxide (P2O5) and a 25-year mining plan of 68-million tons, grading at 29.9% P2O5.

The current strategy is to engage in a production of two-million tons of phosphate rock a year for a minimum of 25 years, through opencast mining using dredges and simple beneficiation processes to produce phosphate rock concentrate, while increasing the phosphate resources.

A total of 68-million tons of measured and indicated resources, at a grade of 29.9% P2O5, with a cutoff of 1.5 m and an average thickness of 3.3 m, has been defined on the northern side of the Cacheu river, which is the preferred mining area.

Value
Capital costs are estimated at $300-million and operating costs at $60/t.

Duration
First production is targeted to start in 2013.

Client
Plains Creek Phosphate Corporation (formerly Resource Hunter Capital Corporation).

Key Contracts and Suppliers
GBM Minerals Engineering & Golder Associates (bankable feasibility study (BFS)).

Latest Developments
GBM Minerals Engineering in partnership with Golder Associates, of London, have been awarded a contract to update the existing resource model, with a view to developing a definitive mine plan for the phosphate mining operation.

Meanwhile, drilling crews have been mobilised to undertake the geotechnical drilling and, where necessary, infill resource drill holes. Preliminary metallurgical samples have also been taken from the existing cores for bench-scale testing.

In addition, large-diameter drilling has started on site to collect a representative sample of around five metric tons of phosphate ore for metallurgical pilot tests and the production of product samples for potential offtake partners.

Engineering work has also restarted on the slurry pipeline, the beneficiation plant design, infrastructure and roads. The BFS study is expected to be completed in the fourth quarter of 2011.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Plains Creek Phosphate Corporation corporate development director and VP Carson Phillips, tel +1 604 657 5871 or email cphillips@plainscreek.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.056 0.09s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: