Eyre Peninsula project gets A$36m price tag
PERTH (miningweekly.com) – A scoping study into the Eyre Peninsula graphite project, in South Australia, has estimated a preproduction capital cost of A$36-million to develop a 11 592 t/y operation.
ASX-listed Archer Exploration told shareholders on Monday that production would increase to 18 648 t/y after year seven of operations, following a further A$25-million of capital investment to increase capacity from 140 000 t/y to 210 000 t/y.
The project is expected to have a mine life of some 17 years.
“The scoping study showed that the Eyre Peninsula graphite project is an exciting project which can generate strong returns for Archer shareholders,” said executive shareholder Greg English.
He noted that the project had the capacity to deliver a solid platform for the company from which to increase production rates and mine life, subject to the usual approval processes.
The scoping study estimated that the project would generate a net operating pre-tax cash flow of A$21.5-million a year, delivering a life-of-mine pre-tax net cash flow of A$366-million.
The project’s net present value was estimated at A$126-million and its internal rate of return at 62%.
“Based on these positive results from the scoping study, we plan to complete and lodge the mining lease application and finalise all other project approvals at the same time, with a view to Archer obtaining a granted mining lease in the middle of 2017.”
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















