ECS to upgrade major pumping station for Environment Agency
This article has been supplied.
Following an extensive review of the flood risk management strategy for the Isle of Axholme, the Environment Agency has begun implementing the recommendations of the final report. One of the major pieces of infrastructure is the pumping station at Keadby, which will be renovated and updated by ECS Engineering Services.
Originally built in 1939 and situated on the outfall of three man-made rivers in North Lincolnshire, Keadby pumping station is a strategic water control asset that delivers flood resilience to the Axholme catchment. Over the years some improvements have been made, but much of the equipment on site is now considered as being beyond its expected service life and has been identified for a major asset refurbishment. Having operated as a main contractor for the Environment Agency for many years, ECS has recently won the contract to improve the reliability and efficiency of the pumping station and will be delivering Phase 1 of the project, which is expected to last five years.
The scope of the project includes replacement of two of the diesel engines that power the water pumps with new units that are more reliable, efficient and matched to the performance of the pumps. In addition the gearboxes, located between the engines and the water pumps, will be remanufactured with new gears to provide the correct performance ratios. The single electric drive motor at Keadby will also be replaced with a new, more efficient model that will be controlled by a variable speed drive. This will help to reduce energy consumption and match pump performance to the prevailing conditions. The gearbox on this motor will also be replaced to ensure optimum reliability and performance as the pump that it drives is the primary water control asset used throughout the year.
Further improvements will be made to the weed clearance equipment, which will be replaced with a more reliable arrangement that has already been proven on another Environment Agency pumping station in the area. Upgrades to the electrical system, SCADA control and telemetry will also be included, providing the Environment Agency with a greatly improved flood control asset and all achieved without affecting the ability of the station to maintain local water levels.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















