https://www.miningweekly.com
DIESEL ENGINES|Engines|Platinum
DIESEL ENGINES|Engines|Platinum
diesel-engines|engines|platinum

Eastplats produces first PGMs concentrate from small-scale circuit

24th March 2021

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JSE-listed Eastern Platinum (Eastplats) has completed all the necessary reconfiguration and optimisation work at its small-scale platinum group metals (PGMs) circuit in the Bushveld Complex.

The small-scale circuit, or PGM Circuit D and previously “scavenger plant circuit”, forms part of a restart process for the main PGM plant circuit.

The small-scale plant has, since March 23, started dispatching PGM concentrate.

The company completed the upgrades to obtain higher-quality concentrate to be able to consistently produce a minimum 200 t of PGMs concentrate a month.

This is expected to have a positive impact on the company’s revenue.

PGM Circuit D uses the initial work on the PGM Main Circuit. The next phase of the PGM Main Circuit work is on track to start in May, with commissioning expected in October.

Restarting the main circuit will add a further 800 t a month of PGMs concentrate to production.

CEO Diana Hu says Eastplats is ramping up its PGMs production at a time of increasing demand and rising PGMs pricing.

“Several countries recently legislated new curbs on pollution from gasoline and diesel engines, boosting the use of PGMs in autocatalysts, the largest application of PGMs.”

 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.123 0.162s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: