Dugbe 1 project, Liberia.

Client
Hummingbird Resources.

Project Description
The Dugbe shear zone area consists of 2 000 km² in central eastern Liberia, located about 40 km north-east of the coastal town of Greenville.

The project is underlain by Birimian geology, making it highly prospective for gold, and is currently Hummingbird’s most advanced project, with more than 61 000 m of drilling completed and a 3.8-million-ounce gold resource.

A preliminary economic assessment (PEA) on the Dugbe 1 project envisages 3.5-million-tonnes-a-year plant tank-leach process, producing an average of 125 000 oz/y of gold.

Mining at the project will be undertaken through a conventional openpit operation, with ore and waste extracted through drill, blast, load and haul methods.

Value
$212-million, although contract mining may significantly reduce initial capital expenditure to $143-million.

Duration
It is estimated that first production could be achieved within 18 months from the start of construction of the 3.5-million-tonne-a-year plant.

Latest Developments
The PEA supports the company’s decision to rapidly progress the Dugbe 1 project towards a definitive feasibility study (DFS).

To this end, MDM Engineering Group has received a letter of intent to complete the DFS and front-end engineering and design (Feed) for Dugbe 1 project.

To expedite the timeframe of mine construction, the Feed will be conducted simultaneously to the DFS, allowing the company to proceed directly to an engineering, procurement and construction contract after the completion of the DFS.
Hummingbird expects the DFS and the Feed to be completed by the end of the third quarter of 2014.

Key Contracts and Suppliers
MDM Engineering Group (DFS and Feed).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Hummingbird Resources, tel +44 20 3416 3560.
MDM Engineering Group, tel +27 11 993 4300 or fax +27 11 886 9306.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 0.801s - 111pq - 2rq
Subscribe Now