https://www.miningweekly.com
Copper|Engineering|flotation|Infrastructure|Mining|PROJECT|System|transport|Underground|Infrastructure
Copper|Engineering|flotation|Infrastructure|Mining|PROJECT|System|transport|Underground|Infrastructure
copper|engineering|flotation|infrastructure|mining|project|system|transport|underground|infrastructure

DRA Global awarded BFS contract for Managem’s Morocco copper mine

Tizert copper deposit, in Morocco

Tizert copper deposit, in Morocco

1st July 2019

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Managem Group has awarded engineering group DRA Global’s Montreal office a contract to conduct the bankable feasibility study (BFS) on the Tizert copper project, located in the Souss-Massa province of Morocco.

The Tizert copper deposit is located on the northern edge of the Igherm Precambrian buttonhole and is the largest copper deposit in the western Anti-Atlas copperbelt.

This underground mine, with targeted production of 3.3-million tonnes of ore a year, will use multiple mining methods including room and pillar and long-hole stopping.

An aerial ropeway system will be used to convey the ore from the mine site to the process plant site across an 800-m-wide and 250-m-deep canyon.

The process plant will be a flotation concentrator that produces oxide and sulphide copper concentrates.

DRA’s Montreal office has been awarded the full BFS scope which will include mining, backfill, ore transport, process plant and related infrastructure.

The BFS is expected to be completed in the second quarter of 2020.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.105 0.143s - 108pq - 2rq
Subscribe Now