Doornkop South reef project, South Africa
Name and Location
Doornkop South reef project, Gauteng, South Africa.
Client
Harmony Gold Mining Company.
Project Description
The project will entail the three-phase deepening of the Doornkop main shaft to 1 973 m to access the South reef.
As at June 30, 2011, total proven and probable reserves at Doornkop South were 3.2-million tonnes, with a grade of 5.33 g/t gold.
Value
The estimated final capital cost of the project is R1.772-billion.
Duration
Full production is expected in 2015/16.
Latest Developments
The project is in the build-up phase.
In the year ended June Harmony reported higher gold production at Doornkop of 556 kg. Recovered grade increased by 9% from 3.31 g/t to 3.6 g/t and tonnes milled increased by 9%.
In the quarter ended June 30, Doornkop’s recovered grade remained stable at 3.55 g/t, while tonnes milled decreased by 3% quarter-on-quarter to 242 000 t. The decrease in tonnes was because of illegal labour disruptions during the quarter that lasted for about four days and resulted in a 4% decrease in gold production to 859 kg. The appropriate action was taken regarding the labour unrest and no further disruptions were reported during the quarter.
Lower gold production and an increase in electricity tariffs, as well as plant and stores costs during the quarter, resulted in a 13% increase in operating costs to R332 516/kg, impacting on the operating profit quarter-on-quarter.
On Budget and on Time?
Most of the equipping of the main shaft was completed on schedule.
Key Contracts and Suppliers
Murray & Roberts (civil contractor); Alstom Mine Winders (mill and winders); Melfix (shaft works); Octa Engineering (mechanical contractor); FLS Minerals (winders); Horma and Weir (pumps); Coilmech (winders); Hoistec (winders); Concor (cement and premix); GKD Delkor/Betterect (settlers); CU Engineering, Okta Engineering, Seran Engineering, Potch Engineering, Quntra Engineering, Rovic Engineering (steel fabrication); Carmen (vibro feeders); Superior Mining (various); Trucking & Engineering, Robor, AIG Sales, Mining Pressure Systems (piping); Turnberry Projects (engineering consultant) and Schneider Electric South Africa (design, supply and installing the winder control system upgrade).
Contact Details for Project Information
Harmony Gold Mining Company investor relations officer Henrika Basterfield, tel +27 11 411 2314, fax +27 11 692 3879 or email henrika@harmony.co.za.
Schneider Electric South Africa, tel +27 11 254 6500, fax +27 11 254 6700/6704 or email enquiries@schneider.co.za.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation