https://www.miningweekly.com

Doornkop mine, South Africa

27th September 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Doornkop mine, Gauteng, South Africa.

Client
Harmony Gold Mining Company.

Project Description
The project will entail the three-phase deepening of the Doornkop main shaft to 1 973 m to access the South reef.

As at June 30, 2013, total proven and probable gold reserves at Doornkop were 7.6-million tonnes, with a grade of 4.99 g/t gold.

Value
The estimated final capital cost of the project is R1.772-billion.

Duration
Full production is expected in 2015/16.

Latest Developments
The project remains in a production build-up phase.

In the year ended June Harmony reported higher gold production year-on-year at Doornkop of 556 kg. Recovered grade increased by 9% from 3.31 g/t to 3.6 g/t and tonnes milled increased by 9%.

On Budget and on Time?
Not stated.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
Harmony investor relations manager Henrika Basterfield, tel +27 11 411 2314, fax +27 11 692 3879 or email henrika@harmony.co.za.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.042 1.056s - 111pq - 2rq
Subscribe Now