https://www.miningweekly.com
Construction|Contractor|Design|Iron Ore|Mining|PROJECT|Service|Storage|Maintenance|Infrastructure
Construction|Contractor|Design|Iron Ore|Mining|PROJECT|Service|Storage|Maintenance|Infrastructure
construction|contractor|design|iron-ore|mining|project|service|storage|maintenance|infrastructure

Decmil wins Iron Bridge work

16th September 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Contractor Decmil has been awarded a A$41-million contract to undertake non-mining process infrastructure works at the $2.6-billion Iron Bridge magnetite project, in the Pilbara.

Under the scope of the work, Decmil will design and construct a bulk fuel storage and transfer facility, a mobile maintenance complex, including workshops, warehouses and related satellite offices, and site service facilities.

The bulk fuel storage and transfer facility will provide a refueling facility for heavy vehicles, while the mobile maintenance complex will include a heavy vehicle workshop that incorporates locker storage, tool storage and an administration area.

Construction is scheduled to start in September and will be completed in May 2021.

Iron-ore major Fortescue is planning for first concentrate production from Iron Bridge in the first half of the 2022 calendar year, with the project expected to produce 22-million tonnes a year of magnetite concentrate.

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe
Alco-Safe

An unmanned breathalyser that is made to be tough and simple to use. Can be used in any environment for operator-free breathalyser testing.

VISIT SHOWROOM 
Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.153 0.185s - 91pq - 2rq
Subscribe Now