Cullinan C-Cut Phase 1 expansion programme, South Africa
Name of the Project
Cullinan C-Cut Phase 1 expansion programme.
Location
Gauteng, South Africa.
Client
Petra Diamonds (74%), Kago Diamonds (14%) and the Itumeleng Petra Diamonds Employee Share Trust (12%).
Project Description
The Cullinan mine contains a world-class resource base of 194.2-million carats as of June 30, 2016. Petra plans to capitalise on this by undertaking an expansion programme to increase production to an estimated 2.2-million carats a year by the 2019 financial year, comprising two-million carats run-of-mine (RoM) and 200 000 ct of tailings.
C-Cut Phase 1 will establish a new block cave on the western side of the orebody, in the upper portion of the major C-Cut resource, which is estimated to contain 133-million carats. It will also involve a large tailings retreatment operation.
The development plan will allow for the tonnage profile to gradually progress from the old mining areas, heavily diluted with waste rock, to the new mining areas, thereby providing access to undiluted ore. As a result, the RoM grade is expected to increase to 38 to 40 carats per hundred tonnes (cpht) in the 2017 financial year to about 49 to 51 cpht by the 2019 financial year, when the C-Cut Phase 1 block cave is in full production.
Petra’s current mine plan envisions a life-of-mine (LoM) to 2030, but the major residual resources at the mine indicate that the actual LoM could be more than 50 years.
Phase 2, which is still at the conceptual phase and not included in the LoM to 2030, aims to further expand Cullinan’s RoM production to four-million tons a year, with a yield of two-million carats a year from 2019 to 2030. The conceptual framework indicates that Phase 2 will expand the C-Cut by another 7.8 ha.
Jobs to be Created
A crew of 45 Murray & Roberts Cementation personnel is working on the project site; however, during the peak development phase of the programme, from May 2014 to May 2015, 386 employees were on site.
Net Present Value/Internal Rate of Return
Not stated.
Value
R4-billion.
Duration
The plan is to increase production from 729 496 ct to 2.2-million carats by the 2019 financial year.
Latest Developments
Petra has reported that the C-Cut Phase 1 project is progressing well and in line with expectations.
The ramp-up of production will continue during the 2018 financial year and is expected to contribute more than 2.2-million tonnes for the year.
RoM is expected to remain at about 50 cpht from the 2019 financial year onwards, when Cullinan’s C-Cut block cave reached steady-state production.
Key Contracts and Suppliers
MDM Engineering, the South African division of Amec Foster Wheeler (Cullinan plant contract) and Murray & Roberts (Cullinan shaft contract).
On Budget and on Time?
The project is progressing well and in line with expectations.
Contact Details for Project Information
Petra Diamonds, email info@petradiamonds.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation