Cullinan C-Cut expansion programme, South Africa
Name and Location
Cullinan C-Cut expansion programme, Gauteng, South Africa.
Client
Petra Diamonds (74%), Thembinkosi Mining Investments (14%) and the Petra Diamonds Employee Share Trust (12%).
Project Description
The Cullinan mine contains a world-class resource base of 200.8-million carats, including 17-million carats in tailings. Petra plans to capitalise on this by undertaking an expansion programme to increase production to 2.2-million carats a year by the 2019 financial year, comprising two-million carats run-of-mine (RoM) and 200 000 ct of tailings.
This expansion plan, known as C-Cut Phase 1, will establish a new block cave on the western side of the orebody, in the upper portion of the major C-Cut resource, which is estimated to contain 133-million carats and will also involve a large tailings operation.
The development plan will enable the tonnage profile to gradually switch from diluted to undiluted ore. As a result, RoM grade is expected to increase to about 35 carats per hundred tonnes (cpht) by the 2015 financial year, 37 cpht by the 2016 financial year and to more than 50 cpht by the 2019 financial year, when the C-Cut Phase block cave is in full production.
Petra’s current mine plan has a life of 17 years, but the major residual resources at the mine indicate that the actual life-of-mine could be more than 50 years.
Value
Not stated.
Duration
The plan is to increase production from one-million carats in 2011 to 2.2-million carats by the 2019 financial year.
Latest Developments
Petra Diamonds has reported that the shaft deepening and underground development at Cullinan continues to progress in line with expectations, with the C-Cut Phase 1 waste development yielding 2 361 m, raiseboring delivering 389 m and kimberlite development delivering 967 m in its interim results for the six months to December 31, 2014.
Meanwhile, Petra is continuing to deliver on its group targets, with production forecast to grow further to about 3.3-million carats in the 2015 financial year and to an estimated five-million carats in the 2019 financial year.
The continued focus on operational performance, combined with the company’s robust financial position, places the company in a strong position to capitalise on the positive medium- to long-term outlook for the diamond industry.
Key Contracts and Suppliers
Murray & Roberts Cementation (deepening of Shaft 1 and Shaft 3, as well as associated infrastructure and planned level development) and ABB (upgrade of the Koepe winder and ropes).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Petra Diamonds, tel +27 11 702 6900, fax +27 11 706 3071 or email info@petradiamonds.com.
Murray & Roberts Cementation, tel +27 11 201 5000.
ABB (South Africa), tel +27 10 202 5000 or fax +27 11 579 8000.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















