Construction starts at Orocobre and Toyota Tsusho’s Japan plant
Lithium miner Orocobre and joint venture (JV) partner Toyota Tsusho Corporation (TTC) on Tuesday held a ground-breaking ceremony to mark the beginning of construction on the Naraha lithium hydroxide plant, in Japan.
The plant will convert primary-grade lithium carbonate feedstock sourced from the Olaroz facility, in Argentina, into purified battery-grade lithium hydroxide. Some 9 500 t/y of primary grade lithium carbonate will be used to produce 10 000 t/y of battery grade lithium hydroxide.
Orocobre MD and CEO Martin Perez de Solay said that the start of construction came at an opportune time, as demand for low-cost battery grade lithium hydroxide was forecast to grow significantly.
Sale of the lithium hydroxide will be managed by TCC as exclusive sales agent under a similar JV marketing arrangement to that operating for lithium carbonate from the Olaroz lithium facility. The majority of production is expected to be delivered to the Japanese battery industry.
Orocobre said that a cathode manufacturing plant was already in operation in the immediate vicinity and that plans had been announced to develop a battery manufacturing facility nearby.
The JV partners announced the approval of the $77.6-million lithium hydroxide plant in April and said, at the time, that it would be commissioned in the first half of the 2021 calendar year.
Dual-listed Orocobre holds a 75% interest in the project.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation