https://www.miningweekly.com
Construction|Copper|Industrial|Power|PROJECT|Products
Construction|Copper|Industrial|Power|PROJECT|Products
construction|copper|industrial|power|project|products

Codelco ends long-term mined copper deals to China clients from 2025 -sources

18th September 2023

By: Reuters

  

Font size: - +

LONDON – Chile's Codelco is ending long-term contracts to sell copper concentrate to Chinese clients from 2025, bidding to broaden its product offering to them after evaluating its production outlook, five sources with direct knowledge of the matter said.

The sources said Codelco is aiming to replace exclusively copper concentrate deals with others that include concentrate and value-added intermediate products such as blister and anode which are derived from concentrate and can be turned into copper metal or cathode.

Some Chinese customers have protested against the changes, but will have to accept new contract negotiations that include intermediates because they will need Codelco's concentrates at a time when deficits are expected, the sources said.

The Chilean miner wants to restructure its sales strategy and agreements because of uncertainty about whether it can meet its contractual obligations, the sources said.

"Some measures adopted are due to the normal management of Codelco's commercial product portfolio and not to availability adjustments and/or lower production," Codelco said in response to a request for a comment.

"Codelco continually updates its contracts according to the prevailing dynamics in the market."

Operational problems at the state-owned miner saw its production slip last year to about 1.46-million metric tons, the lowest in around a quarter of a century and output has slipped further this year.

Codelco is expected to produce between 1.31-million to 1.35-million metric tons of copper a key material for the power and construction industries.

Output at the world's largest copper producer has been dropping despite $15 billion invested in flagship mines including El Teniente and Chuquicamata where costs have overrun significantly, according to an influential industry body.

The sources, all of whom have long-term contracts with Codelco, said they had been receiving termination notices from Codelco from July to August and that the company wanted to start new agreements with different terms.

Two of the sources said Codelco was ending their evergreen supply contracts from 2025. Evergreen contracts introduced by Codelco in 2018 are two-year and three-year deals which roll over annually, in which customers can be assured of certain amounts a year.

Codelco accounts for 29% of Chile's copper production. Chile's congressional committee in late August launched an investigation to review Codelco's corporate structure and project delays.

China is the world's biggest buyer of mined copper with its import volume accounting for over 60% of the world's total. The world's largest consumer of industrial metals bought 25.3 million tonnes of copper concentrates last year, according to International Copper Study Group.

The global copper concentrate market is expected to see a steep deficit during 2025-2027 as Asian and African smelters ramp up capacity, outpacing mine supply.

Edited by Creamer Media Reporter

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
ARM, GoldOre, Gautrain make headlines
22nd September 2023
Magazine cover image
Magazine round up | 22 September 2023
22nd September 2023
Resources Watch image
Resources Watch
21st September 2023

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.073 0.112s - 114pq - 2rq
Subscribe Now