Clayton Valley lithium project, US
Name of the Project
Clayton Valley lithium project.
Location
Esmeralda County, Nevada, in the US.
Project Owner/s
Cypress Development Corp.
Project Description
A positive prefeasibility study (PFS) on the Clayton Valley project envisages a mine with an average production of 15 000 t/d to produce 27 400 t/y lithium carbonate equivalent over a mine life of more than 40 years.
Production is based on probable mineral reserves of 222-million tonnes, averaging 1 141 parts per million lithium carbonate equivalent.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The PFS estimates an after-tax net present value, at an 8% discount rate, of $1.05-billion and an internal rate of return of 25.8%, based on a price of $9 500/t for lithium carbonate.
Capital Expenditure
Preproduction capital is estimated at $493-million.
Planned Start/End Date
Not stated.
Latest Developments
The next step is a pilot plan programme as recommended by the PFS. Work under way includes core logging and analyses on several drill holes, supplemental metallurgical tests and environmental studies. Cypress intends to invite proposals that can add value to the project and the company through financial, technical, operating or marketing capabilities.
Key Contracts and Suppliers
Continental Metallurgical Services (PFS).
Contact Details for Project Information
Cypress Development Corp, tel +1604639 3851 or email info@cypressdevelopmentcorp.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















