Citronen lead/zinc development, Greenland
Name of the Project
Citronen lead/zinc development.
Location
The Citronen Fjord zinc/lead deposit is located within the Lower Palaeozoic Franklinian basin of northern Greenland.
Client
Ironbark Zinc.
Project Description
The project represents one of the world’s largest undeveloped zinc/lead resources.
The project is a relatively simple, pre-dominantly underground room-and-pillar mining operation that will concentrate ore through industry-proven dense-media separation (DMS) and flotation techniques to produce saleable separate zinc and lead concentrates for the world markets.
An updated feasibility study on the project envisages a mine rate of 3.3-million tonnes a year, with a production rate of up to 200 000 t/y of zinc metal.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.03-billion and an internal rate of return of 36%.
Value
The project has an estimated capital cost of $514.21-million.
Duration
Not stated.
Latest Developments
Further metallurgical testwork will start shortly to target feasibility-level engineering confidence in the highest levels of recovery achieved in earlier work (up to 90%) and test a two-stage DMS upgrade.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Ironbark Zinc, tel +61 8 6461 6350, fax +61 8 6210 1872 or email admin@ironbark.gl.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation