Chvaletice manganese project, Czechia

Chvaletice manganese project, Czechia

30th September 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Chvaletice manganese project (CMP).

Location
About 90 km east of Prague, in Czechia.

Project Owner/s
Euro Manganese.

Project Description
A feasibility study on the project, published in July 2022, has determined that the CMP is uniquely positioned to provide a secure, traceable and responsibly produced supply of high-purity manganese products to the European electric-vehicle market.

The study is based on the reprocessing of historic tailings, without the requirement of any hard-rock mining, crushing or milling.

The feasibility study envisages a 25-year operation producing 1.19-million tonnes of high-purity electrolytic manganese metal, about two-thirds of which is expected to be converted into high-purity manganese sulphate monohydrate on site.

Saleable product includes 2.5-million tonnes of high-purity manganese sulphate monohydrate (32.34% manganese) and 372 300 t of high-purity electrolytic manganese metal (99.9% manganese) over the life of the project, averaging 98 600 t/y of high-purity manganese sulphate monohydrate and 14 890 t/y of high-purity electrolytic manganese metal.

New and refurbished infrastructure that will be built to service the project includes:

• a tailings excavation and handling facility;
• a south and north site connection utility bridge for transporting tailings slurry, return water pipes and the tube conveyor that returns a mixture of nonmagnetic tailings and washed leach residue to the residue dry stacking area;
• enclosed and winterised process plant buildings and various reagent storage facilities and a product warehouse;
• an upgraded rail spur system with related loading/unloading facilities;
• an internal road network;
• an incoming electrical 400 kV high-voltage grid connection, including transformers, GIS switchgear and local distribution step-down transformers;
• a process equipment maintenance workshop;
• a mobile fleet maintenance workshop;
• spare parts and maintenance supply warehouses;
• a comprehensive water management system and on-site laboratories; and
• general administrative offices.

Potential Job Creation
The project expects to employ about 400 people during operation.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.75-billion and an internal rate of return of 24/9% with a 3.6-year payback.

Capital Expenditure
Initial capital is estimated at $757.3-million, including contingencies of $103.2-million.

Planned Start/End Date
Plant commissioning is expected to start in 2026, with production expected to start in 2027.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Tetra Tech (feasibility study); BGRIMM (lead process plant design engineer); Tractebel (Czech and European cost inputs, localisation); GET and Bilfinger Tebodin Czech Republic (environmental services); and Sudop (railway infrastructure design).

Contact Details for Project Information
Euro Manganese, tel +1 604 681 1010 or email info@mn25.ca.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.272 0.329s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: