Chirundu uranium joint-venture project, Zambia
Name and location
Chirundu uranium joint-venture project, Zambia.
Project description
The prefeasibility study (PFS) on the Chirundu uranium project envisages uranium ores being mined initially from the Njame deposit only, with mining and heap leaching to start at the Gwabe site once Njame has been exhausted.
Njame North has an indicated resource of 3,9-million tons of U3O8 at 388 parts per million (ppm), and an inferred resource of 5,2-million tons of U3O8 at 275 ppm.
The Gawbe deposit has an indicated resource of 0,9-million tons at 196 ppm of U3O8 and an inferred resource of four-million tons at 303 ppm of U3O8.
All mining will be from openpits, with ore stacked as a series of cells on a single-lined leach pad. Waste will be stored on a waste dump. The mine is expected to deliver 1,3-million pounds of U3O8 a year over a five-to six-year project life.
Value
The estimated capital costs of the project amount to $68-million preproduction costs with an additional $21-million required for deferred cost.
Duration
Not stated.
Breakdown of main contracts
Not stated.
Client
Albidon (30%) and African Energy Resources (AFR) (70%).
Latest developments
AFR's board has approved a bankable feasibil]ity study, which started in early May.
Participants
Mintek Laboratories, SGS Lakefield, Knight-Pieshold, GRD Minproc, Utilink and African Energy (PFS).
Construction materials
Not stated.
On budget and on time?
Not stated.
Contact details for project information
Albidon, tel +61 8 9211 4600, fax +61 8 9211 4699 or email info@albidon.com.
AFR, tel + 44 1481 234101 or email info@africanenergyresources.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation