Cerro del Gallo heap-leach gold project, Mexico
Name of the Project
Cerro del Gallo (CDG) heap-leach gold project.
Location
The project is located 30 km east of Guanajuato City, Guanajuato, Mexico.
Project Owner/s
Argonaut Gold.
Project Description
A prefeasibility study (PFS) has demonstrated the project as a long-life, low-cost asset in an attractive mining jurisdiction.
The project has been planned as an openpit, truck-and-shovel operation.
The PFS proposes that the CDG property will be mined by a mining contractor, using 91 t haul trucks and 13 m3 front-end loading equipment. Ore will be sent from the pit directly to the crusher prior to heap leaching. Mine throughput is estimated at six-million tonnes a year.
The PFS envisages production of about 64 000 oz/y of gold, 1.3-million ounces a year of silver and 2 400 t/y of copper over a 15.5-year mine life.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $290-million and an internal rate of return of 25.8%, with an after-tax payback period of 4.5 years.
Capital Expenditure
Initial capital costs are estimated at $134-million.
Planned Start/End Date
Completion is expected to take 18 months.
Latest Developments
None stated.
Key Contracts and Suppliers
None stated.
Contact Details for Project Information
Argonaut Gold, tel +1775 284 4422 or email info@argonautgold.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















