https://www.miningweekly.com

Carrapateena copper/gold sublevel cave project, Australia

20th April 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Carrapateena copper/gold sublevel cave project.

Location
The project is located north of Port Augusta, in South Australia’s highly prospective Gawler Craton.

Client
Oz Minerals.

Project Description
Oz Minerals has progressed the project to feasibility-study stage, outlining plans for a 4.25-million-tonne-a-year sublevel cave mining operation with a 20-year mine life and an average copper equivalent grade of 2.31% in ore milled.

The project entails a conventional copper concentration processing plant, producing an estimated average of 66 000 t/y of copper and 80 000 oz/y of gold for the first three years of full production. Average life-of-mine production is estimated at 65 000 t/y of copper and 67 000 oz/y of gold.

Main access is through a decline and secondary access through a conveyor decline.

Oz Minerals has removed the construction of a conventional copper concentrate treatment plant from the project base case.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value (NPV), at a 9.5% discount rate, of about A$910-million and an internal rate of return of 20%.

Since the prefeasibility study, the NPV of Carrapateena has increased by 18%, owing to increased metal production, higher consensus prices and the removal of the concentrate retreatment plant costs.

The project has a five-year capital payback from the start of production.

Value
The project has a preproduction capital cost of about A$916-million.

Duration
The project will progress in two phases, the first of which will begin in September with the construction of enabling infrastructure, including the accommodation village and airstrip. The second phase is scheduled to start in the second quarter of 2018 and includes the construction of the process plant and other above-ground infrastructure.

Commissioning and first ore to be processed are scheduled for the fourth quarter of 2019.

Latest Developments
Oz Minerals has awarded a A$660-million underground mining services contract to project house Downer EDI for the Carrapateena underground mine.

The six-and-a-half-year contract will comprise all underground mining activity, including site setup and development to the top of the orebody and infrastructure excavation, production setup and ramp-up, and bedding in steady-state operations at nameplate site capacity.

Downer is expected to mobilise to the Carrapateena soon, initiating a ten-week transition period to assume responsibility for all underground mining operations from July 1.

Meanwhile, all primary approvals for the project are in place, and a mining lease has been granted by the South Australian government, while the federal government has given Environmental Protection and Biodiversity Conservation Act approval.

Key Contracts and Suppliers
Ausenco-Downer joint venture (processing plant, nonprocessing and underground infrastructure), NRW (tailings storage facility, civil, western access road and airstrip), PYBAR (decline development) and ElectraNet (build, own, operate and maintain agreement).

On Budget and on Time?
None stated.

Contact Details for Project Information
OZ Minerals, tel +61 8 8229 6600, fax +61 8 8229 6601 or email info@ozminerals.com.
 

 

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 1.076s - 111pq - 2rq
Subscribe Now