Carrapateena copper/gold sublevel cave project, Australia
Name of the Project
Carrapateena copper/gold sublevel cave project.
Location
The project is located in South Australia’s highly prospective Gawler Craton.
Client
OZ Minerals.
Project Description
A prefeasibility study (PFS) on the Carrapateena orebody has affirmed the outcomes of a scoping study completed in early 2016. The PFS has demonstrated that the project is technically and financially viable, with a risk and opportunity profile that is competitive with, or better than, other global long-life copper assets at a similar stage of development.
The study envisages a four-million-tonne-a-year sublevel cave mining operation, with an average copper equivalent grade of 2.31% in ore milled.
The project includes the construction of a conventional copper concentrate treatment plant (CTP) producing an estimated 66 000 t/y of copper and 82 000 oz/y of gold for the first three years of full production, and averages of an estimated 61 000 t of copper and 63 000 oz/y of gold over the life-of-mine.
Carrapateena has a 20-year mine life.
Jobs to be Created
Not stated.
Net Present Value/Internal Rate of Return
The project has a net present value (NPV), at a 9.5% discount rate, of about A$770-million and an internal rate of return (IRR) of 20% on an unlevered, post-tax basis at consensus pricing.
Excluding the one-off deferred consideration payment of $50-million, the project has an NPV of about A$820-million and IRR of about 21%.
The project has a short four-year capital payback from start of production.
Value
The project has a preproduction capital cost of about A$980-million, including the CTP, owner’s cost and contingency.
Duration
The PFS proposes a fast-tracked development programme to enable first production by the second quarter of 2019.
Latest Developments
Oz Minerals has further cemented its plans for the Carrapateena copper/gold project increasing the project’s current budget to A$90-million.
At the end of March, an estimated A$53-million had already been spent, with a further A$37-million to be spent on continued decline construction, further mine design optimisation to bring it to feasibility study stage, and to accelerate all other nonmining work packages through an early contractor involvement (ECI) model.
Under the ECI model, appointed contractors will undertake design, engineering and construction of key aspects of the mine on an open book basis, prior to entering a fixed price contract, allowing the company to lock in pricing and potentially accelerate the commitment phase of the project schedule.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
None stated.
Contact Details for Project Information
OZ Minerals, tel +61 8 8229 6600, fax +61 8 8229 6601 or email info@ozminerals.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation