Cariboo gold project, Canada

Name of the Project
Cariboo gold project.
Location
Central British Columbia, Canada.
Project Owner/s
Osisko Development Corp.
Project Description
A preliminary economic assessment (PEA) has illustrated the potential economics for a low-cost, large-scale, underground gold project, with industry-leading operating costs.
The project will comprise three sites: the Mine Site Complex, near the District of Wells, the Bonanza Ledge site, and the QR mill.
The study outlines total gold production of 2.8-million gold ounces, resulting in an average gold production profile of 236 000 oz/y over a 12-year mine life.
The PEA envisages a phased construction approach, with initial construction enabling a 2 000 t/d mine, and an expansion raising the throughput to 8 000 t/d for about 297 000 oz/y over an eight-year period.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 5% discount rate, of $764-million and an internal rate of return of 21.4%, with payback of six years.
Capital Expenditure
Initial capital costs are estimated at $122-million, with expansion capital estimated at $716-million.
Planned Start/End Date
First gold pour targeted for the first quarter of 2024.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
BBA Engineering (PEA).
Contact Details for Project Information
Osisko Development Corp, tel +1 514 940 0670 or email nfo@osiskogr.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















