Burnstone gold mine restart project, South Africa
Name and Location
Burnstone gold mine restart project, Mpumalanga, South Africa.
Client
In April 2014, Sibanye Gold concluded the acquisition of Witwatersrand Consolidated Gold Resources (Wits Gold). Wits Gold had previously secured an option to acquire Southgold Exploration, which owns the Burnstone mine through a business rescue process. Following an extensive due diligence, Sibanye indicated its intention to exercise the option to acquire Southgold. Transaction closure is dependent on Southgold coming out of business rescue.
Project Description
Sibanye Gold is reviewing its options to bring the idled Burnstone mine back into production from a zero base.
Sibanye believes that the mine failed owing to several factors, including an incorrect resource model and the use of an inappropriate mining method for the complex structure, which led the previous owners of the mine, Great Basin Gold, to mine the wrong sections at a substantial cost.
Sibanye plans to design the mine around the orebody and institute conventional breast mining technology and narrowly focus on selective, higher-grade sections after redoing the mine resource model and targeting higher-grade areas earlier.
The company aims to remove tramming constraints through historically mined reef areas on footwall drives and use conventional and proven ventilation layouts.
Further, Sibanye plans to remove mechanised on-reef development to reduce unplanned dilution and loss factors, and use multiple existing development ‘attack’ points to fast-track development and create flexibility.
Conceptual model parameters envisage steady-state production at between 80 000 oz and 100 000 oz.
Value
Sibanye initially earmarked R180-million over 15 months for infrastructure capital.
Duration
Not stated.
Latest Developments
Sibanye is upgrading its due diligence study to a detailed life-of-mine plan, due for completion in the first quarter of 2015, which will be associated with South African Mineral Resource Committee-compliant resources and reserves.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Sibanye Gold head of corporate affairs James Wellsted, tel +27 11 278 9600 or email james.wellsted@sibanyegold.co.za.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation