Bunyu graphite project, Tanzania – update

Name of the Project
Bunyu graphite project.
Location
Tanzania.
Project Owner/s
Volt Resources.
Project Description
An updated prefeasibility feasibility study (PFS) on the Bunyu graphite project has improved the economics of the Stage 1 project.
The Stage 1 operation is based on a mining and processing plant of 400 000 t/y of ore, producing on average 24 780 t/y of graphite products.
The updated PFS has estimated a capital cost of $33.1-million, compared with the $31.8-million estimated in the 2018 PFS, with the project’s net revenue increasing from $268.6-million to $433.2-million, its after-tax net present value from $14.7-million to $36.4-million and its internal rate of return from 19.3% to 23.6%.
The project’s mine life has also increased from 7.1 year estimated in the original PFS to nearly 14 years.
Potential Job Creation
Stage 1 has a pretax net present value, at a 10% discount rate, of $18.6-million and an internal rate of return of 21%, with a payback after tax of 4.4 years.
Net Present Value/Internal Rate of Return
The updated PFS delivers a pretax net present value of $58.9-million and an internal rate of return of 31.5%, with a payback period of 2.9 years.
Capital Expenditure
The updated PFS has estimated a capital cost of $33.1-million, compared with the $31.8-million estimated in the 2018 PFS.
Planned Start/End Date
Not stated.
Latest Developments
Having commissioned Bunyu Stage 1, Volt intends to progress to Stage 2 later this decade to leverage the platform established by Stage 1, and Bunyu’s status as one of the biggest graphite resources globally, to significantly scale production from 24 780 t/y to 170 000 t/y and help meet the forecasted global increase in demand for graphite products.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Volt Resources, tel +61 8 9486 7788 or email info@voltresources.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















