Buck Creek No 2 coal project, US

3rd June 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Buck Creek No 2 coal project, Illinois, US.

Client
Paringa Resources.

Project Description
When Paringa originally acquired the coal leases comprising the Buck Creek mining complex in 2013, the only historical work that had been conducted on the property was on the No 1 Mine and, as a result, the No 1 Mine was the company’s initial focus.

Paringa has since acquired additional coal leases, undertaken expanded drilling programmes and prepared a geological model for the entire Buck Creek mining complex. This has led to the discovery of a section of coal to the south of the No 1 Mine area, with a shallow depth from surface that could be suitable for a simple, low-cost boxcut mine development to access the coal seam.

The discovery has prompted Paringa to undertake technical studies on a shallow section of coal, now called the No 2 Mine. Based on the exceptional results of these studies, Paringa will now develop the low capital expenditure (capex) No 2 Mine first, followed by the shovel-ready No 1 Mine, as part of a staged development strategy for building a new midtier, high-margin Illinois basin coal company.

Using the Buck Creek mine complex’s coal resource estimate of 224.8-million tons of coal, the project can support production of 2.3-million-tonnes-a-year of run-of-mine coal yielding an estimated 1.8-million tonnes a year of saleable clean coal at steady-state production over a 20-year mine life.

Proposed production from the mine will come exclusively from room-and-pillar mining methods.

The Buck Creek mine complex will ultimately become a strategic 5.6-million-tonne-a-year supplier of high-quality coal into the growing eastern US power market.

Net Present Value/Internal Rate of Return
Not stated.

Value
The project has an initial cost of $44.4-million.

Duration
Construction of Buck Creek No 2 is expected to take 12 months. Paringa hopes to start construction by the second quarter of 2017, with production targeted for mid-2018.

Latest Developments
With the permitting process now under way for the Buck Creek No 2 Mine, Paringa Resources expects construction of the mine to begin by the second quarter of 2017, with production due to get under way by mid-2018.

Paringa also continues to make progress with potential equity and debt financiers in the US.

The No 2 Mine required standard permits for mining, surface facilities, refuse storage and transportation, as well as Paringa securing these standard mine permits by the June quarter of next year.

The company has retained the services of consulting firm Associated Engineers for the permitting of the new coal mine.

Paringa has noted that almost 60% of No 2 Mine’s yearly production during the five-year sales agreement is now contracted with Louisville Gas & Electric and Kentucky Utilities.

It has also indicated that there is potential for significant reductions to the operating and capital costs at the Buck Creek mine complex, owing to continued reductions in labour, materials, supplies and fuel costs.

Further, there is potential for market conditions to improve following an unprecedented rationalisation of US coal production and further consolidation of supply into the Ohio River market.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Paringa Resources, tel +61 8 9322 6322, fax +61 8 9322 6558 or email info@paringaresources.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 
Environmental Impact Management Services
Environmental Impact Management Services

EIMS is an independent specialised environmental consulting firm offering the full spectrum of environmental management services across all sectors...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.046 0.742s - 111pq - 2rq
Subscribe Now