https://www.miningweekly.com
Building|Construction|Engineering|Mining|PROJECT|Testing|Solutions
Building|Construction|Engineering|Mining|PROJECT|Testing|Solutions
building|construction|engineering|mining|project|testing|solutions

Browns Range heavy earths pilot plant development project, Australia – update

Image of rare earth oxides

8th September 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Browns Range heavy earths pilot plant development project.

Location
Western Australia.

Project Owner/s
Northern Minerals.

Project Description
The project has been separated into three development stages and enables Northern Minerals to test the process, market the mixed rare-earth carbonate product, develop the project to bankable feasibility study (BFS) level and build the full-scale operation.

Stage 1 includes the construction of a three-year, 60 000 t/y pilot plant operation. It will comprise an opencut mining operation, with processing through a beneficiation and hydrometallurgical pilot plant to produce 49 000 kg/y of dysprosium in 590 000 kg/y of total rare-earth oxide (TREO) contained in a mixed rare-earth carbonate. This stage is important to derisk the operation by testing the process and improving the knowledge of grade control and the project’s geology.

Stage 2 involves developing the project to BFS level, based on the definitive feasibility study completed in March 2015; and on the results of the studies, announced on August 27, 2015, aimed at reducing mining costs, boosting production, producing a premium product and increasing the ore reserve.

The final stage involves building the project to full-scale production, based on the successful outcomes of stages 1 and 2. Once at full-scale, the project will process 585 000 t/y to produce 279 000 kg of dysprosium contained within 3 098 000 kg/y TREO (before yttrium rejection) in a mixed rare-earth carbonate.

Potential Job Creation
The project is expected to create 50 construction jobs and 45 ongoing operational positions.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The project has a capital cost of A$56-million.

Planned Start/End Date
First production targeted in 2026, subject to approvals and project funding.

Latest Developments
Northern Minerals has announced a A$25-million capital raise to advance its Browns Range project towards a final investment decision in the first half of 2024.

The company said on September 6 that it had successfully placed more than 833.3-million shares, at 3c each, to sophisticated and institutional investors. The placement price represented a 9.1% discount to the company’s last closing price and a 9.7% discount to its five-day volume weighted average share price.

The new shares will be issued under Northern Minerals’ existing placement capacity and will not require shareholder approval.

An updated definitive feasibility study on the A$500-million Browns Range project is due later this year.

Key Contracts, Suppliers and Consultants
MACA (bulk earthworks); Primero (turnkey solutions provider); Sinosteel MECC (engineering, procurement and construction contract); and K-Technologies (scoping study).

Contact Details for Project Information
Northern Minerals, tel +61 8 9481 2344, fax +61 8 9481 5929 or email info@northernminerals.com.au.

Edited by Creamer Media Reporter

Comments

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.113 0.165s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: