Browns Range heavy earths pilot plant development project, Australia
Name of the Project
Browns Range heavy earths pilot plant development project.
Location
Western Australia.
Client
Northern Minerals.
Project Description
The Browns Range pilot plant will be used to assess the economic feasibility of a full-scale project and forms part of a broader ongoing feasibility study underpinning the Browns Range rare earths project. The Browns Range project will focus on the production of dysprosium.
The pilot plant is expected to operate for three years initially, with a throughput of 60 000 t/y. This is about 10% of the size of the full-scale development to assess, refine and confirm the optimal flowsheet.
The ore will be processed from two separate openpits – Wolverine and Gambit West – of varying depths and mineral concentrations to determine the optimal flowsheet for the proposed full-scale development.
Owing to the small volumes involved in the pilot plant project (180 000 t over three years), Northern Minerals has decided to mine all of this material in one campaign in 2017, with ore stockpiled on the run-of-mine pad.
During the three-year pilot project, the plant is expected to produce 1 719 000 kg of total rare-earth oxide in a mixed rare-earth carbonate containing 148 200 kg of dysprosium.
Jobs to Be Created
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Value
The project has a capital cost of A$56-million.
Duration
The project will take 11 months to build, with mixed rare-earth carbonate production expected in mid-2018.
Latest Developments
Northern Minerals has approved the development of the Browns Range heavy earths pilot plant development project.
The company is finalising the selection of a preferred mining contractor, which will also be responsible for clearing the plant site, building the tailings storage facility and access road for the project.
Sinosteel MECC has been awarded the contract to fully construct the modules for the pilot processing plant in China before transporting and assembling them on site.
Key Contracts and Suppliers
Sinosteel MECC (engineering, procurement and construction contract).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Northern Minerals, tel +61 8 9481 2344, fax +61 8 9481 5929 or email info@northernminerals.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















