https://www.miningweekly.com
Coal|Construction|Energy|Environment|Export|Mining|PROJECT|Projects|Resources|Water
Coal|Construction|Energy|Environment|Export|Mining|PROJECT|Projects|Resources|Water
coal|construction|energy|environment|export|mining|project|projects|resources|water

Broadmeadow East and Isaac River coal projects, Australia – update

Image of coal spew

Photo by © Reuters

9th June 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Broadmeadow East (BME) and Isaac River coal projects.

Location
The Broadmeadow East project is situated about 185 km south-west of Mackay, Queensland, and 25 km north-east of the major regional township of Moranbah in the central Bowen basin, in Australia.

The Isaac River project, in the central Bowen basin, is about 30 km to the east of Moranbah, in Central Queensland, Australia.

Project Owner/s
Bowen Coking Coal.

Project Description
The BME and Isaac River coal projects form part of Bowen Coking Coal’s greater Burton Complex.

The BME project has resources of 33-million tonnes, of which 10.6-million tonnes are in the measured and indicated categories. Isaac River has resources of 8.7-million tonnes, of which 8.3-million tonnes are in the measured and indicated categories.

The coal at BME has the flexibility to produce a primary coking coal product of either high quality (7.5% ash, up to CSN 7.5) or high yield (9.2% ash, CSN 4.5). In both of the primary product cases, the secondary energy coal created from the primary coking coal discard has a calorific value of more than 6 500 kcal/kg, which is also a sought-after product for the export coal markets.

The results of the first-stage independent scoping studies on the BME and Isaac River coal projects have shown a run-of-mine (RoM) production target of 800 000 t/y to 1.1-million tonnes a year over a five- to seven-year life-of-mine (LoM) for BME, and 400 000 t/y to 600 000 t/y over a four- to five-year LoM for Isaac River.  

Potential Job Creation
The Isaac River mine project is expected to create 200 jobs at steady state.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The BME project is expected to cost A$6-million to A$8-million and the Isaac River project A$14-million to A$17-million.

Planned Start/End Date
Not stated.

Latest Developments
The Department of Climate Change, Energy, the Environment and Water has formally approved Bowen Coking Coal’s Isaac River mine.

The company has said that it is now finalising the mining lease approval process with landholders and the Queensland government, and is anticipating construction to start in 2024.

“After a lengthy process, this is a significant milestone for Bowen Coking Coal and the Isaac River project. It will enable the company to continue to deliver much-needed metallurgical coal to growing market demand, and will aid Bowen in achieving . . . [its] vision of an annualised run-of-mine production target of five-million tonnes by 2024,” CEO Mark Ruston has said.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Bowen Coking Coal, tel +61 7 3191 8413 or email info@bowencokingcoal.com.

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.116 0.17s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: