https://www.miningweekly.com
Energy|Gas|Infrastructure|PROJECT|Renewable Energy|Renewable-Energy|Solar|Infrastructure
Energy|Gas|Infrastructure|PROJECT|Renewable Energy|Renewable-Energy|Solar|Infrastructure
energy|gas|infrastructure|project|renewable-energy|renewable-energy-company|solar|infrastructure

Bristol Springs to cost A$242.5m

20th March 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The definitive feasibility study (DFS) for the Bristol Springs renewable energy project, in Western Australia, has confirmed its potential to produce some 4.9-million kilogrammes a year of hydrogen at a total cost of A$2.77/kg.

ASX-listed Frontier Energy on Monday told shareholders that the Stage 1 development is expected to cost A$242.5-million, which is up slightly from the A$236.2-million reported in the prefeasibility study, with the capital cost including a 114 MW solar farm and 36 MW alkaline electrolyser.

“We are delighted with the outcome of the study as it again highlighted the unique opportunity we have at Bristol Springs to be a first mover in the green hydrogen industry,” said Frontier Energy MD Sam Lee Mohan.

“The infrastructure surrounding the project not only allows for our forecast costs to be some of the lowest in Australia for green hydrogen production, but also provides an opportunity for early production as the industry continues to mature over time.

“We believe the most likely pathways to early production will come from hard-to-abate sectors through accessing the nearby Dampier to Bunbury Natural Gas Pipeline, which can already take up to 9% hydrogen, as well as the potential for the development of a peaking plant, which uses hydrogen for flexible energy generation to meet high demand periods on the WA electricity grid,” said Lee Mohan.

“Both of these potential early pathways to production are in line with the Western Australian government’s strategy and targets for the production and consumption of green hydrogen within the state.”

Looking ahead, Frontier will now work to secure offtake with a foundation customer for the Bristol Springs project, and said on Monday that it was in the advanced stages of a process for engaging with a number of parties.

Following an offtake agreement, the company will start project financing discussions and negotiations.

Edited by Creamer Media Reporter

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
SBS Tanks
SBS Tanks

SBS® Tanks is a leading provider of innovative water security solutions with offices in Southern Africa, East and West Africa, the USA and an...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.353 0.392s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: