Bougouni lithium project, Mali

29th November 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bougouni lithium project.

Location
The project is located in southern Mali.

Project Owner/s
Kodal Minerals.

Project Description
A scoping study completed on the Bougouni project has confirmed its outstanding potential.

The study has evaluated the technical and potential economic viability of an openpit mine development at the project’s Goulamina deposit, where a maiden mineral resource of 15.5-million tonnes at a grade of 1.48% lithium oxide has been defined.

Various processing options have been considered to optimise throughput capacity and recoveries. The current preferred option is to develop Goulamina as a one-million-tonne-a-year, high-grade openpit mine to supply material to a conventional dense-media separation plant (DMS) in Stage 1.

The scope has been defined to transition the processing plant to treat medium-grained material by DMS and flotation in later years (Stage 2).

Stage 2 will comprise the addition of a 450 000 t/y grinding and flotation concentrator to process fines and secondary DMS floats that contain economic lithium grades from finer-grained, spodumene-bearing rock. Subject to further detailed studies, the project could deliver average yearly production of about 190 000 t of 6% lithium oxide concentrate over an initial 13-year life-of-mine.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Initial start-up capital has been estimated at $47.2-million and includes associated project infrastructure.

Stage 2 capital costs have been estimated at $36.2-million, which could potentially be funded by Stage 1 cashflow.

Planned Start /End Date
Not stated.

Latest Developments
Kodal Minerals has received approval for the environmental- and social-impact assessment (Esia) application for its Bougouni lithium project.

The finalisation of the mining assessment and the submission of technical reports to lodge the mining licence application are expected by the end of the year.

Key Contracts and Suppliers
Zivvo (consultant).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Kodal Minerals, tel +61 418 943 345.

 

 

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 
Environmental Impact Management Services
Environmental Impact Management Services

EIMS is an independent specialised environmental consulting firm offering the full spectrum of environmental management services across all sectors...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.076s - 111pq - 2rq
Subscribe Now