Bomboko mine expansion project, Guinea
Name and Location
Bomboko mine expansion project, Guinea.
Project Description
The project aims to expand production at the Bomboko alluvial diamond mine from 3 500 t/m of gravel to 35 000 t/m of gravel.
Operations at the mine started with a ten-foot pan plant and a 14-t excavator, capable of treating 7 000 t/m. The commissioning and installation of a 16-ft pan plant and a 46-t excavator are expected to increase the production rate to 18 000 t/m.
Extensive sampling has identified a potential resource of up to 750 000 ct at grades up to 28 cpht, mainly gem quality.
Value
Expansion costs have not been disclosed.
Duration
The mine came on stream in March 2009.
Production started in April 2009, with a higher production rate expected by October 2009.
Client
West African Diamonds.
Key Contracts and Suppliers
None stated.
Latest Developments
A recent diamond sale of a sample parcel of diamonds has resulted in revenues of $50 270 for 433 ct. The largest diamond, at 16,27 ct, sold for $1 000/ct. The remaining 420 ct sold for a collective $34 000.
On Budget and on Time?
Too early to state.
Contact Details for Project Information
West African Diamonds, tel +353 1 8332833 or fax +353 1 8333505.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















