https://www.miningweekly.com
Consulting|Copper|Gold|Mining|PROJECT|Resources|srk|SRK Consulting|Underground
Consulting|Copper|Gold|Mining|PROJECT|Resources|srk|SRK Consulting|Underground
consulting-company|copper|gold|mining|project|resources|srk|srk-consulting|underground

Bolivar copper/gold/silver project, Mexico

30th October 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bolivar copper/gold/silver project.

Location
Chihuahua state, in Mexico.

Project Owner/s
Sierra Metals.

Project Description
Bolivar is an operational mine.

A preliminary economic assessment on the expansion of the Bolivar mine has supported Sierra’s organic growth strategy to double production at the mine from 5 000 t/d to 10 000 t/d by 2024, based on the current mineral resource. Indicated resources are estimated at 19.4-million tonnes grading 15.1 g/t silver, 0.21 g/t gold and 0.77% copper. Inferred resources are estimated at 21.4-million tonnes grading 14.2 g/t silver, 0.21 g/t gold and 0.78% copper.

The project has a mine life of 14 years, based on the existing mineral resource estimate, with life-of-mine (LoM) payable copper, gold and silver production estimated at 250 000 t, 150 000 oz and 12.9-million ounces respectively.

The primary mining method at Bolivar is underground room and pillar mining. Previous mining at Bolivar has sometimes used lower-cost and more productive longhole stope mining in areas where the mineralised zones have a steeper dip angle, and the mine plans to undertake a geotechnical assessment programme in 2020/21 to expand the use of longhole mining.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $283-million and an internal rate of return of 27.9%.

Capital Expenditure
Total life-of-mine capital costs are estimated at $317-million.

Planned Start/End Date
Not stated

Latest Developments
Sierra plans to complete a prefeasibility study to further derisk the plan and determine the best way forward.

Key Contracts, Suppliers and Consultants
SRK Consulting (mineral resource estimate).

Contact Details for Project Information
Sierra Metals, tel +1 416 366 7777 or email info@sierrametals.com.

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.14 0.182s - 127pq - 2rq
Subscribe Now