Boikarabelo coal project, South Africa

22nd March 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Boikarabelo coal project, Limpopo, South Africa.

Client
Resource Generation (ResGen).

Project Description
Boikarabelo has probable reserves of 745-million tons, a measured resource of 1.1-billion tons, an indicated resource of 551.7-million tons and an inferred resource of 1.5-billion tons.

The Boikarabelo coal seam is between 20 m and 30 m below surface, enabling low-cost, opencut mining. The seam is between 120 m and 130 m thick, with zones of varying quality thermal and soft coking coal.

The mine will be developed in a two-phased approach to limit upfront capital expenditure (capex). The first phase will deliver about 12-million tons of run-of-mine coal a year, which will equate to about six-million tons of product coal. Of this, three-million tons are destined for the export market and three-million tons will be used domestically.

Phase 2, planned for 2018, will involve ramping up production to 20-million tons of product coal.

The project includes a 36 km rail link to the existing rail network.

Boikarabelo hosts a life-of-mine of up to 100 years.

Value
ResGen has reported that it will save about $120-million in construction costs at its Boikarabelo mine, after it secured electricity supply from the grid.

The estimated capital cost for the project has now been reduced to $630-million, reflecting the flexibility by State-owned power utility Eskom and its commitment to supply power for Stage 1 of the mine development by as early as 2014.

Duration
ResGen’s black economic-empowerment (BEE) subsidiary, Ledjadja Coal, received the Boikarabelo mining rights from the Department of Mineral Resources in April 2011.

Construction of the mine is scheduled to start by the first quarter of 2013 and will take about 24 months to complete.

The mine is expected to begin production in 2015.

Latest Developments
ResGen is considering alternative sources of funding to construct its Boikarabelo coal mine.

The miner has received credit-approved offers of project finance, but notes that these offers include commercial conditions that are unacceptable to the company.

While negotiations on these conditions continue, ResGen has launched parallel discussions with existing and potential customers that have expressed interest in providing equity funding to enable major construction to start at Boikarabelo.

“Without contingencies and cost associated with debt funding, capital expenditure is estimated at A$530-million, which includes A$100-million for mobile equipment,” says Resgen MD Paul Jury.

Jury says that if the company secures finance from alternative sources to part-fund this expenditure, the company will have the flexibility to raise the remaining capital required to complete construction of the mine through equity or debt later on.

Due diligence conducted by the independent experts, on behalf of the financiers, have identified no material issues. The credit-approved offers of finance have confirmed the Boikarabelo project’s viability and potential.

ResGen has secured all regulatory approvals, the land for the mine and rail link has been acquired and the company has contracts providing rail haulage and port access. In addition, it has three significant export contracts for thermal coal with major Indian customers and the global trader Noble Group.

Construction of site infrastructure, roadworks and water and power connections have started. The site is now classified as an operating mine site.

Key Contracts and Suppliers
Digby Wells Environmental (mining right application, mine-waste licence, environmental authorisation process for power plant), RSV Enco (engineering, procurement and construction management for mine construction) and RCE (rail design and construction).

On Budget and on Time?
First production has been delayed to the first half of 2015.

Detailed mining and engineering plans have reduced the estimated first-stage cost of the mine to $630-million.

Contact Details for Project Information
ResGen (Australia), tel +61 2 9376 9000, fax +61 2 9376 9013 or email info@resgen.com.au; or (South Africa), tel +27 12 345 1057 or fax +27 86 539 3792.
Digby Wells Environmental, tel +27 11 789 9495 or +27 11 504 1400, fax +27 11 789 9498 or +27 11 504 1446, or email info@digbywells.co.za.
RSV Enco, tel +27 11 498 6010, fax + 27 11 498 6210 or email enco@rsvenco.com.
RCE, tel +27 12 450 0040 or fax +27 12 450 0060.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.424s - 111pq - 2rq
Subscribe Now