Block 103 iron-ore project, Canada
Name of the Project
Block 103 iron-ore project.
Location
The project is located in Newfoundland and Labrador, Canada.
Project Owner/s
M3 Metals.
Project Description
A rescoping study has successfully reduced the projected capital costs of the project by implementing a phased-capacity approach. This will start with the base case four-million-tonne-a-year projected production of high-grade premium iron-ore fines concentrate, from the previously proposed 16-million tonnes a year and by modifying processing methods and introducing new efficiencies.
The study integrates a conceptual dry-stacked tailings facility to provide less environmental risk, as well as simpler rehabilitation and closure, a smaller footprint and reduction of water consumption.
The project has defined 7.2-billion tonnes at 29.2% total iron, with metallurgical test results showing a projected 69.5% iron concentrate and a low 0.4:1 strip ratio.
Potential Job Creation
Not stated.
All-In Sustaining Costs/All-In Costs
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
The rescoping study has reduced the projected capital costs on the project from about C$6-billion to C$840-million.
Planned Start/End Date
Not stated.
Latest Developments
M3 Metals is seeking a partner to progress the project through feasibility and towards production.
Key Contracts and Suppliers
None stated.
Contact Details for Project Information
M3 Metals, tel +1604669 2279 or email info@m3metalscorp.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















