Blackwater gold/silver project, Canada – update
Name of the Project
Blackwater gold/silver project.
Location
The project is located in central British Columbia, Canada.
Project Owner/s
Artemis Gold.
Project Description
Artemis released the results of a prefeasibility study (PFS), based on a revised development approach, in August 2020.
The PFS proposes the staging of the ultimate development of the mine, among other derisking initiatives, which allow for improved economics while enabling the company to phase the development before ramping up to full throughput of 20-million tonnes a year.
The proposed mine plan involves mining 334-million tonnes of ore, 584-million tonnes of waste rock and 83-million tonnes of overburden.
The project will comprise the construction, operation and closure of an openpit gold and silver mine and ore-processing facilities, starting with a nominal milling rate of 15 000 t/d, or 5.5-million tonnes a year.
The ore-processing facilities will be expanded to achieve 33 000 t/d, or 12-million tonnes a year, starting in Year 6, with a final expansion to achieve 55 000 t/d, or 20-million tonnes a year, starting in Year 11.
The material will be sourced through conventional openpit mining methods, initially targeting high-grade, near-surface ore for processing, with lower-grade material being stockpiled for processing at the end of the mine life.
Most of the waste material sourced from the pit will be used to build the tailings storage facility (TSF) or placed in the TSF itself. Overburden and nonpotentially acid-generating waste-rock not required for construction will be placed in stockpiles adjacent to the openpit. Potentially acid-generating waste-rock, along with tailings, will be deposited into the TSF located to the north/north-west of the openpit.
In addition to the site infrastructure, a proposed 134 km, 230 kV transmission line will be built from the BC Hydro Glenannan substation near Endako, British Columbia, to provide power for the project.
Openpit mining methods, comprising drill, blast, load and haul, will be used.
The openpit mine is expected to operate for 18 years, excluding 15 to 18 months of preproduction mining. Following mining operations, stockpiled low-grade material will be processed for an additional five years, resulting in a total life-of-mine of 23 years.
The openpit will be developed with a series of pushbacks. The first stage will target suitable waste rock for construction while exposing near-surface, high-grade material. The second phase will target higher-grade, lower-strip-ratio ore, providing mill feed over the initial years of the project. The remaining stages expand the pit to the north, targeting progressively deeper ore.
The mining and fleet maintenance operations will be owner-managed. The mine equipment fleet is planned to be bought through lease arrangements.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The base case estimated an after-tax net present value, at a 5% discount rate, of $2.25-billion and an internal rate of return of 34.8%, with a payback on initial capital of two years.
Capital Expenditure
The base case estimates an initial capital cost of $592-million.
The Phase 2 expansion will cost about $426-million and Phase 3 $398-million.
Planned Start/End Date
Not stated.
Latest Developments
One year away from the planned start of major construction activities at the Blackwater gold project, Artemis is preparing to start early works on the site.
The company has submitted its application to the British Columbia government to undertake an early works construction programme, focusing on clearing of key infrastructure areas, including haul roads, the Stage 1 TSF and camp areas.
In addition, construction of the mine access road and plant-site bulk earthworks will be fast-tracked to facilitate early mobilisation of the engineering, procurement and construction contractor to site upon receipt of major works permits.
Permitting approvals are anticipated late in the second quarter.
Key Contracts, Suppliers and Consultants
Moose Mountain Technical Services, with support from Knight Piésold (PFS).
Contact Details for Project Information
Artemis Gold, tel +1 604 558 1107 or email info@artemisgoldinc.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















