BHP faces first step in $6.3bn UK claim over Brazil dam failure
LONDON – More than 200 000 Brazilian people and groups will next week kick off a five-billion-pound lawsuit against Anglo-Australian miner BHP in Britain over a 2015 dam failure that led to Brazil's worst environmental disaster.
The group claim, one of the largest in British legal history, has been brought on behalf of Brazilian individuals, businesses, churches, organisations, municipalities and indigenous people and will open in Manchester on July 22.
An initial, eight-day hearing will establish whether the case can be heard in Britain, although the judge is expected to reserve judgment until later in the year. If successful, further trials are expected to determine liability and quantify damages.
BHP spokesman Neil Burrows said the claim did not belong in Britain because it duplicated proceedings in Brazil and the ongoing work of the Renova Foundation, an entity created by the miner and its partners to manage reparations and repairs.
The collapse of the Fundao tailings dam, which stored mining waste and is owned by the Samarco joint venture between BHP and Brazilian iron ore mining company Vale, killed 19 and spilled roughly 40-million cubic metres of toxic sludge into communities, the Rio Doce river and Atlantic Ocean 650 km away.
Claimants allege BHP, the world's largest miner by market value, ignored safety warnings as the dam's capacity was repeatedly increased by raising its height - and disregarded cracks that pointed to early signs of rupture.
"The public companies at the top of the BHP group structure, which we firmly believe bear ultimate responsibility for the disaster, have until now been insulated from its consequences within the Brazilian legal system," said Tom Goodhead, a partner at law firm PGMBM, which represents the claimants.
Goodhead said Brazilian environmental law had a long reach and imposed strict liability for environmental damage.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation