Bellevue gold project, Australia
Name of the Project
Bellevue gold project.
Location
Western Australia.
Project Owner/s
Bellevue Gold.
Project Description
A Stage 1 feasibility has found the project to be ranked among Australia’s Top-25 gold mines, based on yearly production.
The project has a maiden probable ore reserve of 2.7-million tonnes at 8 g/t gold for 690 000 oz.
Life-of-mine (LoM) mineral resources and reserves are estimated at 5.6-million tonnes grading 6.4 g/t gold for 1.1-million ounces of gold.
The feasibility study proposes an operation with average production of 160 000 oz/y in years 1 to 5 and an LoM average of 151 000 oz/y.
Bellevue is expected to have an initial LoM of 7.4 years.
The on-site conventional gravity and carbon-in-leach processing facility has a capacity of 750 000 t/y.
The project is designed to be easily expanded to accommodate future exploration success.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of A$900-million and internal rate of return of 58%, with a payback of 1.4 years.
Capital Expenditure
The project has a preproduction capital requirement of A$255-million, excluding a A$14-million contingency.
Planned Start/End Date
Not stated.
Latest Developments
A feasibility study upgrade is scheduled for the June quarter of 2021 and is designed to identify immediate growth opportunities incorporating latest discoveries and additional mineralisation.
Underground development and early site works are progressing rapidly, with more than 1 000 m of development completed to date. Early works are planned to accelerate development, with village construction scheduled to start in mid-2021.
Key Contracts, Suppliers and Consultants
Entech (feasibility study).
Contact Details for Project Information
Bellevue Gold, tel +61 8 6373 9000 or email admin@bellevuegold.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation